Project 01 — Structure
Foundations, frame, floors and stairs. We pour, we lift, and we leave while the concrete is still grey. Twenty-two of these last year, most of them for housing associations that fit out their own buildings.
Project 02 — Skin
Facade, glazing, and the joint between the two. That joint is where almost every argument on a building site happens, so it is where almost all of our drawing time goes. We will not take on a facade without the roof above it.
Project 03 — Roof
Roofs, roof lights and everything above the top floor. Half of this is work on buildings somebody else put up, and it is the only way we ever touch a building we did not start ourselves.
Havenweg 44DordrechtMonday to Friday, 07:00 — 16:00
Casco is a fictional example. The firm, the address, the projects, the guarantee periods and the number of buildings do not exist. Photographs are stock images and do not show this work.