01 — finished 2024
House on a slope
Four rooms on three levels because the ground gave us no choice. The stair is the whole building; everything else hangs off it.
184 m² · timber frame · 14 months on site · budget met
01 — finished 2024
Four rooms on three levels because the ground gave us no choice. The stair is the whole building; everything else hangs off it.
184 m² · timber frame · 14 months on site · budget met
02 — finished 2023
A painter who needed one wall of north glass and nothing else to be interesting. The rest of the house is deliberately dull and that took the longest.
96 m² · brick and steel · 9 months · one revision
03 — on site
Joining a pair of nineteenth-century cottages without pretending they were ever one house. The join is a glass slot you could walk past.
210 m² · listed · 18 months · consent took eleven
04 — drawings
A street where every house faces the road and this one will not. The planning officer has been to see it twice and we are still talking.
142 m² · render and timber · consent submitted
First visit and a written opinion£350
Measured survey£1,200 — £2,400
Design and planning4.5% of works
Technical drawings3% of works
On site, monthly£900
Listed building workplus 1%
A second opinion on somebody else's drawings£350
Telephone advicefree, always
Percentages are of the builder's price, not of what you hoped it would be. The first visit is charged and it is deducted if we go on.
Plumb
One architect, one room,
four houses a year.
8 Battle Hill, Hexham
+44 7700 900 170
Writing to us
Email, with the address and
the real budget in it.